What should a retail tenant include in a rendering work request?
Describe the frontage, separate the tenant’s request from the owner’s approval, and explain how the shop operates before a render package is priced.

A retail tenant’s first request often starts with an appearance problem: a tired band above the sign, a damaged corner beside the door or a finish that no longer suits the shopfront. To turn that into a useful rendering enquiry, establish which part of the building is involved and who can authorise the proposed work. The tenant may know the daily operation best while the owner or managing agent holds the building records. Bringing those two sources of information together is more useful than sending a close photograph with a request to make the wall look new.
Describe the change in the language of the shop
Begin with the reason for the enquiry. Are you changing the frontage as part of a refit, responding to visible damage or investigating marks that keep returning? Identify the area on a photograph showing the complete shopfront. Include the sign, doors and upper windows so the recipient can locate the concern. A second close photograph can show texture or a damaged edge, but it should support the wider view rather than replace it.
Say what you expect to remain. If the windows, sign and entrance are being retained, they form part of the protection and junction discussion. If another contractor is replacing them, the timing becomes part of the rendering brief. Avoid asking for every visible surface to receive the same finish before the existing materials have been identified. A painted fascia, a stone surround and a rendered wall are separate items even when they share a colour.
Make the requested outcome clear without prescribing an unsupported repair. For example, ask for the damaged section beside the entrance to be assessed and for a proposal that preserves the retained frame. That leaves the assessor able to explain what the wall needs. Saying only to cover the mark can conceal the difference between a cosmetic change and work needed before a new finish is applied.
Find out who can approve each part of the proposal
Tell the contractor whether you are the tenant, owner or a person acting for one of them. Identify the managing agent where relevant and explain who should receive the technical proposal. The request should distinguish permission to attend the premises from authority to commission work. A shop manager may be able to arrange a visit without being the person who can accept a price or approve a change to the external wall.
Check the actual lease and management arrangements with the responsible people. Do not infer responsibility for the whole facade from responsibility for the shop’s branding. Upper floors, shared structure, signage and the tenant’s fitted shopfront may be dealt with differently. Where the position is uncertain, obtain clarification before the proposed work is treated as an agreed tenant package.
Keep the owner’s requirements with the enquiry. These might include a specified colour, a consultant’s report or a process for reviewing alterations. Identify the document and its revision rather than paraphrasing an approval from memory. The contractor can then distinguish an accepted requirement from something the tenant would like to propose. Any necessary planning or building-control decisions also need to be resolved for the actual building.
Make one frontage drawing do several jobs
A simple marked photograph can become the common reference for the survey, quotation and approval. Give each surface a clear label and draw the intended finishing boundary. Show where the work meets the neighbouring unit or changes at an upper floor. Use the same labels when discussing alternatives, so a later instruction to include a return can be traced to a specific part of the building.
Include fixtures that could interrupt the finish: alarm boxes, lights, signs, awnings and rainwater fittings. Ask who will disconnect, remove, protect or reinstate each item where required. These responsibilities should be agreed with the relevant trades; they should not appear as an assumption that the rendering team will alter every fitting encountered.
Scroll sideways to see the full table. Keyboard: focus the table, then use the arrow keys.
| Include | Make clear |
|---|---|
| Frontage photograph | Affected surfaces and retained features |
| Approval contact | Who agrees appearance, scope and expenditure |
| Building information | Available survey, material and alteration records |
| Trading requirements | Entrances, deliveries and busy periods |
| Other contractors | Shopfront, sign, electrical and window work |
| Programme | Preferred dates and decisions still outstanding |
Explain a normal trading day
Describe when staff arrive, when deliveries take place and which entrance customers use. Mention accessible routes, refuse collections and any shared passage serving other units. HSE’s public-protection guidance identifies boundaries, neighbouring land use and access as information the project client should provide. The practical question is how the work area can be separated from the people who continue to use the frontage.
For a small premises, a modest restriction can have a large operational effect. A delivery left outside a temporary enclosure may obstruct a route that otherwise looks clear on the plan. Discuss where vehicles can stop and how goods reach the shop while work is under way. The proposed arrangement needs to account for actual movements, not just the hours printed on the door.
Ask the project team to explain any periods when access would change. Agree who tells staff, customers and neighbouring occupiers, and how a revised arrangement will be communicated. A preferred trading plan remains a requirement to assess; it is not proof that every operation can take place while the shop is open. Resolve that question before accepting a programme.

Separate the client role from day-to-day contact
A commercial construction project brings CDM 2015 responsibilities. HSE’s guidance explains the client’s role in suitable project arrangements, appointments and pre-construction information. Establish which organisation is commissioning the project and how those responsibilities are being managed. A tenant’s day-to-day contact with the installer should not leave the project team uncertain about who supplies the relevant building information.
List what is already available and what still needs obtaining. A previous specification may identify the render but say little about later repairs. A survey may cover only the street elevation. Record those limits and let the responsible professionals determine the investigation needed. If work could disturb concealed materials, provide the relevant records before intrusive inspection is arranged.
When several trades are involved, use one programme showing the agreed handovers. The render cannot be priced sensibly against a fixed finishing date if the replacement shopfront date remains undecided. Put the unresolved decision and its owner in the programme. This gives the tenant a practical way to chase missing information before the work sequence is affected.
Ask for a proposal that can be approved
The proposal should refer to the marked frontage and identify preparation, finish, protection, access and reinstatement. Ask which parts are firm and which depend on investigation. Keep optional appearance changes separate from repairs already identified. This makes it easier for the owner or tenant to approve a defined stage without unintentionally accepting every suggested improvement.
Confirm who will approve a sample and what it is intended to demonstrate. A colour board may help the tenant compare shades, while the owner or designer may require a trial showing texture and the meeting of new and retained finishes. Record the accepted sample and the finishing boundary together. A verbal preference for a colour should not become the only record of the agreed result.
Call 01925 918785 with the Cheshire address, your role and the outline of the work. Have the frontage photographs and any owner instructions available, then agree how to provide them. The first discussion can identify the information needed for the next step; the written proposal should carry the final scope and responsibilities.
Questions and answers
Can I obtain an initial opinion before the landlord decides?
You can explain that the enquiry is preliminary and identify what information is needed for the owner’s decision. Keep an initial discussion separate from permission to undertake work or accept a contract.
Should the request include the sign replacement?
Include it as an adjoining activity even if another contractor supplies it. Identify who is responsible and when the sign work will occur, because its fixings and finishing boundary may affect the render package.
Sources and further reading
- HSE: protecting the publicContains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: 22 June 2026Source checked: 23 November 2026
- HSE: commercial clients under CDM 2015Contains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: 12 January 2026Source checked: 23 November 2026