Ask each bidder to state how the elevation will be reached, what the client supplies and how long the arrangement must remain available.

Two commercial rendering bids can describe the same finish while relying on different access arrangements. One may include a fixed scaffold for the package; another may assume equipment supplied by the main contractor or several short visits with mobile access. The totals are difficult to compare until those assumptions are visible. The client’s task is to establish a common scope and have the proposed arrangements assessed by the responsible people. Selecting the cheaper number before resolving access can leave part of the work unprovided or move a significant obligation into another package.
Ask what each bidder has actually allowed
Request a description of the access arrangement for every elevation, including the setup, working period and removal. Identify who supplies the equipment and who coordinates it with the premises. If a bidder assumes access by others, ask which arrangement they have relied on and whether they have checked it against the proposed rendering work.
Separate the area being finished from the ground and surrounding space needed to reach it. A high wall above a lower roof, a projecting entrance or a narrow side yard can change the arrangement. Include the actual features in the enquiry rather than asking bidders to price from a broad elevation area alone. Record any part that has not yet been inspected.
Avoid deciding that one type of equipment is suitable simply because a bid names it. HSE’s work-at-height guidance requires planning, competent people and suitable equipment, with the risks assessed for the task. The proposal needs to be considered against the work and site conditions. Price comparison follows that assessment; it does not replace it.
Flag any proposal that relies on a roof, canopy or other existing structure for access. Supply the available information about that structure and identify who will establish whether the arrangement is suitable. Its appearance in a photograph does not establish its capacity or condition. The enquiry should make this dependency visible before a bidder treats the surface as an available working platform.
Separate a supplied facility from an available facility
A main contractor may already have scaffold on the building, but its presence does not settle the rendering subcontractor’s access. Ask what working areas will be available, at which stage and under whose control. Identify any alteration or handover needed before the rendering operation can use the arrangement. An assumption that the existing scaffold can simply be shared should be checked by the responsible parties.
Write the agreed provision into the enquiry. Include availability dates, any limits on simultaneous use and the process for requesting changes. The bidder can then identify what it still needs to provide. This makes an exclusion such as access by others meaningful because both sides can see the facility being assumed.
The same principle applies to delivery space and storage. A plan showing a vacant corner is not confirmation that the space remains available throughout the work. Identify who controls it and how it will be handed over. If the site programme gives that area to another trade midway through the render package, the access assumption needs revisiting.

Compare duration and return visits
Ask how long the access allowance runs and what starts or ends that period. Does it begin with installation, the first rendering operation or another agreed event? Does it cover all inspection and reinstatement tasks? The proposal should explain those boundaries so the client can see whether a gap remains between the finishing work and removal of the setup.
Distinguish a continuous work period from several visits. A bidder may assume that every window, fitting and substrate detail is ready before it starts. Another may allow for working around the sequence of those trades. Neither assumption should remain hidden in a total. Compare the proposed handovers and identify which programme the client can actually provide.
Ask how a delay outside the stated assumption would be handled in the project agreement. Identify who decides the change and agree the applicable charges or commercial provisions in the actual proposal. Keep an unresolved commercial term visible until it has been agreed. A verbal expectation that the equipment can stay longer is insufficient for a reliable comparison.
Put protection and occupied routes beside access
Access to the wall and protection of the surrounding premises are related but distinct parts of the package. Ask what is included for windows, fittings, neighbouring surfaces and occupied routes. A bid that includes a working platform may still rely on another contractor to provide the surrounding enclosure or maintain a public route.
HSE’s guidance on protecting the public identifies site boundaries, adjacent land use and access as information the client should supply. Give bidders the same operating constraints and ask them to state their assumptions. This helps distinguish the assessed construction arrangement from a promise that the premises can operate unchanged.
Identify the work needed to maintain the arrangement between visits. Who keeps the agreed route clear, responds to a changed entrance requirement or checks that protection remains in place? The construction team should allocate those tasks. The client should be able to see that the allowance covers the agreed working arrangement rather than only its initial installation.
Scroll sideways to see the full table. Keyboard: focus the table, then use the arrow keys.
| Bid item | Question for clarification |
|---|---|
| Equipment | What arrangement has been assessed for each elevation? |
| Provision by others | Which facility and handover are assumed? |
| Duration | What period and completion tasks are included? |
| Return visits | How does the bid treat phased preceding work? |
| Protection | Which surrounding surfaces and routes are included? |
| Changes | Who decides and instructs a revised arrangement? |
Compare bids against the agreed window sequence
Consider a hypothetical office block where window work is planned in two stages. Bid A assumes all windows are complete before rendering starts. Bid B allows for separate returns following the window stages. Even with the same measured area, the proposals describe different sequences. The useful question is which sequence the project will adopt and what each bidder would allow on that basis.
Ask both bidders to identify the effect of the agreed sequence rather than adding an arbitrary adjustment to one total yourself. The consequences may include changed access duration, repeated protection or a different division into elevations. Keep the explanation with the revised proposal so the reviewer can follow why the totals moved.
If a bidder cannot confirm an arrangement without a visit or further design information, record that dependency. It is better to compare a defined provisional item with its resolution process than to treat an unsupported assumption as a fixed saving. The remaining uncertainty should be described clearly enough for the client to decide the next step.

Close the clarification before accepting the bid
Issue the agreed access basis with the final scope and obtain confirmation that the proposal reflects it. Keep the equipment responsibilities, programme assumptions and occupied-route arrangements alongside the specification. Avoid leaving a key clarification in an email that is not referenced by the accepted package.
Before the work begins, reconcile that basis with any site changes since tender. A newly installed canopy or revised delivery route can affect an earlier proposal. Have the responsible team review the change and agree the response before the installer relies on the original assumption. Keep the revised record with the site information used by the people carrying out the work.
For a Cheshire project, call 01925 918785 with the elevation details and the access assumptions in the quotations. Identify which facilities the client intends to provide and which are included in each bid. The comparison should lead to a defined, assessable package rather than a choice between unexplained totals.
Questions and answers
Is scaffold always the right choice for rendering?
The suitable arrangement depends on the task, duration and site. Have it assessed by the responsible competent people and compare bids against the resulting requirements rather than prescribing equipment from the price alone.
Can I compare a bid that excludes access with one that includes it?
Yes, once the excluded facility and responsibility are defined and accounted for in the overall project. Confirm that both rendering proposals rely on the same agreed arrangement and programme.
Sources and further reading
- HSE: introduction to working at height safelyContains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: 1 March 2021Source checked: 23 November 2026
- HSE: protecting the publicContains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: 22 June 2026Source checked: 23 November 2026